Reasons for Ecodesign

Transformer losses represent around 2.5% of EU energy consumption.

Using more energy efficient transformers should lead to energy savings of an estimated 16,2 TWh per year which is half of Denmark’s total annual electricity consumption (32 TWh).

These energy savings represent reduction of 3,7 Mt emissions of CO2  per year.

This is the reason of the implementation of the program: 20 - 20 - 20

  • 20% reduction of greenhouse gas emissions
  • 20% higher energy efficiency
  • 20% of total energy generated from renewables

The rules for EcoDesign entered into market as COMMISSION REGULATION (EU) No 548/2014 in 21.5.2014 implementing Directive 2009/125 / EC of the European Parliament and of the Council with regard to small, medium and large power transformers.

1.10.2019, a new COMMISSION REGULATION (EU) 2019/1783 was issued amending the first Regulation (EU) no. 548/2014 implementing Directive 2009/125 / EC of the European Parliament and of the Council.

Main outcomes of initiative

  • Reduction of load losses and no-load losses for transformers up to 3 150 kVA and Um ≤ 36 kV
  • Increased efficiency of the transformers
  • Reduction of total operating costs

In average electricity passes through up to 5 transformers as it travels from the power plant to the end customer

Decarbonization

The annual electricity saving for transformers could reach in 2040
The annual electricity saving for transformers could reach in 2040

These saving are nearly equivalent to current consumption of the Czech republic.

In average, with using BEZ transformer variant EcoDesign 2, in 30 years lifetime we can reduce CO2  as equivalent of:

BEZ ECODESIGN 2021 SOLUTION

Our products are developed and manufactured in conformity with latest Ecodesign 2 regulations and providing our customers:

  • Lower energy consumption
  • Decreasing CO2  emmisions
  • Operating costs reduction

Three - phase oil - immersed and hermetically sealed transformers 50 - 3150 kVA, 7.2 - 24 kV, Ecodesign 2 (2021)

With CU winding
With CU winding
With AL winding
With AL winding

Cast resin dry type transformers - type aTSE 100 - 3150 kVA, Ecodesign 2 (2021), Aluminium winding

Up to 12 kV
Up to 12 kV
Up to 24 kV
Up to 24 kV

Operating costs and energy savings

Example of total losses comparison for BEZ Oil Transformers, Rated Power 1 000 kVA, up to 24 kV