Quick supply of equipment
Transport
Implementation of PLUTON advanced DC switchgears 3.3 kV and installation of rectifer non-hermetic transformer 6,3MVA
For the first time PLUTON carried out supply of equipment to Estonia for railway traction substation Raasiku, located at the Tallin/Keila railway section with the length of 26,8 km. It took only 2.5 months from the moment of order receipt till supply of equipment to the site. The project was implemented within a maximally short period — it took only 2.5 months from order receipt to the day of supply.
aTUOn 6300kVA 10 500/ 2x1305V